California Gov. Gavin Newsom has signed a bill allowing the Port of Long Beach to streamline the design and construction of Pier Wind, a proposed 400-acre terminal to facilitate the assembly and deployment of floating offshore wind turbines.
Vattenfall is set to increase its offshore turbine servicing capabilities by signing a multi-year framework contract with Van Oord for the charter of the jack-up vessel, MPI Resolution.
Saitec Offshore Technologies, in collaboration with RWE and Kansai Electric Power, has been awarded the final prototype certification by leading certification body Bureau Veritas Marine & Offshore (BV).
THE Philippine Ports Authority (PPA) has kicked off the process of repurposing three ports to service the nascent offshore wind (OSW) industry, according to the Department of Energy (DoE).
Principle Power has unveiled two new semisubmersible floating wind foundation designs: the WindFloat TC (tubular, center column) and WindFloat FC (flat-panel, center column).
Combined, the winds farms are expected to generate an annual production of 1.5 TWh fossil-free electricity, equal the consumption of 350,000 households.
Revolution Wind has successfully completed installation of the project’s first offshore wind turbine, an historic milestone for Rhode Island and Connecticut's first large-scale offshore wind farm and the first multi-state offshore wind farm in the nation.
A new power purchase agreement (PPA) provides for fossil-free electricity from the Nordlicht 1 offshore wind farm to be available for steel production from 2028.